Problem
This client had a small storage area for a large office block adjacent to the underground carpark, the client needed a solution on how to maximize the space to make use of the limited storage space.
Solution
Using our design program, we came up with a shelving solution using our versatile black longspan shelving and workbench system.
Outcome
We supplied and installed the shelving exactly as per the design drawings, the installation was in the underground carpark and was still an active construction site. The team worked together with other trades to get this done in a timely manner.
Testimonial
Emily and Unirack saved the day, our client had last minute project requirements for racking to their new facility in Capital Square, Perth CBD where their field engineers stored equipment and also the need for charging stations.
During a time of long lead procurement and constantly escalating materials costs due to Covid and overseas manufacturing issues they delivered in a short time frame a product that well exceeded our clients’ expectations.
Working with Em and her team from pre Covid to now I can confirm that the same quality and service has carried on. Unirack will be our go to supplier for all the products and services they provide.